Skip to content
WMS-F-01 Rev 0 IDM Engineering (Chester) Ltd
Owner
CRGI > IDM
Approval
Determined by · RWC — approved
Standard
BS EN 1090-1/-2
Filed
00 System Manual and Control/04 Scope and Class Determinations

Execution Class Determination Record

Controlled master

The controlled master is the file on the IDM server, at the location shown above. Download it here; the text below is a convenience rendering of the same document. Where the two differ, the server file governs.

Records how the Execution Class applied to IDM's structural work was determined. Completed per product range and re-checked at technical review for each contract.

Field Entry
Product / product range
Consequence class
Basis for consequence class
Service category
Basis for service category
Production category
Basis for production category
Standard and table used BS EN 1090-2, Annex B — enter the edition held (see WMS-A-11)
EXECUTION CLASS DETERMINED EXC2
Customer imposition, if any
Date of determination
Review trigger Any enquiry indicating a higher consequence class or fatigue-loaded service

EXC2 is confirmed by IDM. The consequence class, service category and production category fields are left blank because they must be completed from IDM's actual product range against the current text of BS EN 1090-2 — CRGI has not asserted them.

Role Name Signature Date
Determined by
RWC — approved
Controlled copy. The controlled master of every document in this system is the file held on the IDM server in the welding management system folder structure. This portal is a controlled view of it. Where the two differ, the server file governs.