WMS-A-05 Rev 0 IDM Engineering (Chester) Ltd
Owner
IDM (Ben)
Approval
Responsible Welding Coordinator · General Manager (IDM) · Quality Manager (IDM)
Standard
BS EN ISO 3834-2 · BS EN 15085-2
Filed
01 Welding Coordination/01 RWC Appointment and Competence

RWC Appointment and Delegation

Controlled master

The controlled master is the file on the IDM server, at the location shown above. Download it here; the text below is a convenience rendering of the same document. Where the two differ, the server file governs.

IDM Engineering (Chester) Ltd

Responsible Welding Coordinator — Appointment & Delegation of Authority

This record appoints the Responsible Welding Coordinator (RWC) for IDM Engineering (Chester) Ltd, defines the authority delegated to that appointment, and records the competence evidence relied upon. It is a controlled record under IDM-FPC-WQM-001 and is reviewed on any change of personnel, scope or certification level.

1. Appointment

Field Detail
Appointee Peter Skillen
Organisation Axis NDT (external appointment)
Role Responsible Welding Coordinator (RWC)
Effective from
Review date
Deputy / cover [TBC — to be nominated]

2. Scope of appointment

  • BS EN ISO 3834-2 — comprehensive quality requirements for fusion welding.
  • BS EN 1090-1 / -2 — structural steelwork, Execution Class EXC2.
  • BS EN 15085-2 — railway vehicles and components, Certification Level CL2 across the rail product range.
  • Materials: carbon steel (primary) and stainless steel (secondary). Aluminium is deferred and outside this appointment.
  • Dissimilar and out-of-scope combinations, including steel to cast iron, are referred to the RWC before any welding proceeds and are not within scope until a qualified procedure and qualified welders exist.

3. Competence evidence

For BS EN 15085-2 CL2 the RWC must hold comprehensive technical knowledge covering all materials in scope. The following evidence is held:

Evidence Reference / issuing body Date Verified by
IWE / EWE certificate [awaited]
CV / experience record
Other (specify)

Verification against BS EN ISO 14731 is recorded above before this appointment takes effect. The appointment is not operative while the competence evidence is outstanding.

4. Availability and escalation

Item Agreed arrangement
Committed availability
Response time — routine referral
Response time — production hold
Contact route
Escalation within IDM
Tasks the deputy may discharge
Tasks reserved to the RWC

5. Delegation of essential welding tasks (BS EN ISO 14731)

A = approves and authorises; the decision rests here and the task is not complete without this signature. P = performs the task day to day. S = supports and provides input. — = no allocation.

Essential welding task (BS EN ISO 14731) RWC Welding Coordinator (internal) General Manager
B.1 Review of requirements A S P
B.2 Technical review A P S
B.3 Sub-contracting (welding, NDT, heat treatment) A S P
B.4 Welding personnel — qualification and continuity A P S
B.5 Equipment — suitability, maintenance, validation A S P
B.6 Production planning A P S
B.7 Qualification of welding procedures A / P S
B.8 Welding procedure specifications A / P S
B.9 Work instructions A P
B.10 Welding consumables A P S
B.11 Materials — purchasing, storage, traceability A S P
B.12 Inspection and testing before welding A P
B.13 Inspection and testing during welding A P
B.14 Inspection and testing after welding A P S
B.15 Post-weld heat treatment A S P
B.16 Non-conformance and corrective action A S P
B.17 Calibration and validation of equipment A S P
B.18 Identification and traceability A P S
B.19 Quality records A P S
B.20 Health, safety and environment S P A

Tasks B.12, B.13 and B.14 are subject to the independence rule at Section 7 of IDM-FPC-WQM-001 where the internal Welding Coordinator is also the welder who made the weld. Health, safety and environmental duties (B.20) remain IDM's statutory responsibility and are not delegated to an external coordinator.

6. Internal welding coordinator

Field Detail
Appointee N. Collins-Hopkins [TBC]
Competence assessed by RWC Yes / No — date:
Basis of assessment
Training needs identified
Also a production welder? Yes — independence rule applies
Own qualification position resolved Yes / No — date:

7. Acceptance

By signing, the RWC accepts the appointment, confirms the delegation at Section 5 is correct and achievable within the availability at Section 4, and confirms the competence evidence at Section 3 is complete and current.

Role Name Signature Date
Responsible Welding Coordinator
General Manager (IDM)
Quality Manager (IDM)

Retained as a controlled record under IDM-FPC-WQM-001 Section 7. Reviewed on any change of personnel, scope or certification level.

Controlled copy. The controlled master of every document in this system is the file held on the IDM server in the welding management system folder structure. This portal is a controlled view of it. Where the two differ, the server file governs.