WMS-A-08 Rev 0 IDM Engineering (Chester) Ltd
Owner
CRGI > IDM
Approval
Auditor · RWC — reviewed · General Manager — actions accepted
Standard
BS EN ISO 3834-2 · ISO 9001:2015
Filed
00 System Manual and Control/05 Internal Audit and Management Review

Welding System Internal Audit Checklist

Controlled master

The controlled master is the file on the IDM server, at the location shown above. Download it here; the text below is a convenience rendering of the same document. Where the two differ, the server file governs.

Conducted annually under QP02 by a competent auditor independent of the activity audited. This checklist supplies the welding content; the audit process, reporting and follow-up remain those of QP02.

Audit date Auditor
Areas audited Report ref

A. System and coordination

Question Evidence to seek C / NC / OFI Finding Ref
Is the current revision of IDM-FPC-WQM-001 in use, and are superseded revisions withdrawn? Manual, master document register
Is the RWC appointment current, with competence evidence on file and verified? WMS-A-05, IWE/EWE certificate
Has the RWC exercised coordination in every period since the last audit? Welding activity log — look for gaps
Are the monthly, quarterly and annual cadence items in Section 16 all evidenced? Welding activity log
Is the deputy arrangement in place and has it ever been used? WMS-A-05, activity log
Have referrals to the RWC been answered in writing within the agreed response time? Coordination correspondence
Is the scope of certification statement current and does actual work fall inside it? WMS-A-02, recent job files

B. Personnel

Question Evidence to seek C / NC / OFI Finding Ref
Does every welder working on certified product hold a current qualification? Welder qualification register, certificates
Are continuity confirmations signed within the required interval for every welder? Continuity confirmation records
Take three welds at random — was the welder qualified for that WPS on that date? Weld log, allocation record, certificates
Is the welder ID and stamp roster current and does it match the weld log? WMS-C-08, weld logs
Is inspection and NDT personnel certification current, IDM and sub-contract? Personnel certificates
Where the internal coordinator welds, was an independent inspector used? Allocation records, inspection records
Is the competence matrix current and are training actions closed? WMS-D-10

C. Procedures and qualification

Question Evidence to seek C / NC / OFI Finding Ref
Is every WPS in production use supported by a valid WPQR? WPS and WPQR registers
Is every WPS signed by the RWC at its current revision? WPS set
Are superseded WPS and retired WPQR out of circulation? Superseded folders, workstations
Do the welding stations hold the correct current WPS? Physical check at the booth
Is every material and filler combination welded covered by the approval matrix? WMS-C-09, weld logs, job files
Has any out-of-scope combination been welded since the last audit? Job files, NCRs, activity log

D. Production control

Question Evidence to seek C / NC / OFI Finding Ref
Take two recent jobs — is the contract and technical review complete and signed? Job folders
Was the weld map produced and approved before welding started? Job folders
Is the weld log completed as work proceeded, or reconstructed afterwards? Weld log — check handwriting, ink, date sequence
Is material traceable from certificate through cutting to the finished weld? Material certs, issue records, weld log
Is consumable batch traceable to the weld? Consumable issue record, weld log
Are storage condition checks being recorded? Storage condition records
Is welding plant within calibration and is expired plant withdrawn? Calibration register, physical check

E. Inspection, non-conformance and release

Question Evidence to seek C / NC / OFI Finding Ref
Was 100% visual inspection carried out and recorded on every contract? Visual inspection records
Was NDT carried out to the extent required by the inspection class? ITP, NDT reports
Are welding NCRs referred to the RWC and dispositions authorised by him? NCR register, NCR records
Were weld repairs carried out to an approved repair procedure? NCR records, repair WPS
Is the documentation pack complete before dispatch? Release notes, job folders
Is the certificate of conformity signed by the correct authority? Release notes

F. Standards and customer requirements

Question Evidence to seek C / NC / OFI Finding Ref
Is the controlled standards register current and has it been checked this year? WMS-A-11
Is any standard in use superseded? WMS-A-11, physical copies
Are customer standards held at the revision the customer currently requires? WMS-D-11, customer correspondence

C = conforms · NC = non-conformance, raise under QP03 · OFI = opportunity for improvement. Every NC is entered in the welding activity log as well as the QP03 register.

Role Name Signature Date
Auditor
RWC — reviewed
General Manager — actions accepted