IDM-FPC-WQM-001 Rev 4 — DRAFT IDM Engineering (Chester) Ltd
Owner
CRGI > RWC
Approval
Responsible Welding Coordinator — acceptance
Filed
00 System Manual and Control / 01 FPC and Welding Quality Manual

Annex A — Welding coordination responsibilities (EN ISO 14731)

Allocation of the essential welding-related tasks. This allocation is CRGI’s proposal and is to be confirmed and signed by the Responsible Welding Coordinator on appointment. [TBC] Health, safety and environmental duties (B.20) are IDM’s statutory responsibility and are not delegated to an external coordinator; the RWC supports on welding-specific matters only. Tasks B.12, B.13 and B.14 are subject to the independence rule in Section 7 where the internal Welding Coordinator is also the welder who made the weld.

Essential welding task (BS EN ISO 14731) RWC Welding Coordinator (internal) General Manager
B.1 Review of requirements A S P
B.2 Technical review A P S
B.3 Sub-contracting (welding, NDT, heat treatment) A S P
B.4 Welding personnel — qualification and continuity A P S
B.5 Equipment — suitability, maintenance, validation A S P
B.6 Production planning A P S
B.7 Qualification of welding procedures A / P S
B.8 Welding procedure specifications A / P S
B.9 Work instructions A P
B.10 Welding consumables A P S
B.11 Materials — purchasing, storage, traceability A S P
B.12 Inspection and testing before welding A P
B.13 Inspection and testing during welding A P
B.14 Inspection and testing after welding A P S
B.15 Post-weld heat treatment A S P
B.16 Non-conformance and corrective action A S P
B.17 Calibration and validation of equipment A S P
B.18 Identification and traceability A P S
B.19 Quality records A P S
B.20 Health, safety and environment S P A

A = approves and authorises; the decision rests here and the task is not complete without this signature. P = performs the task day to day. S = supports and provides input. — = no allocation. A single task may carry both A and P where the RWC both performs and authorises it.

Controlled copy. The controlled master of every document in this system is the file held on the IDM server in the welding management system folder structure. This portal is a controlled view of it. Where the two differ, the server file governs.